Jurisdiction: Siting
Notices
Case No. PU-09-750
Bridger Pipeline LLC
10-inch Crude Oil Pipeline-McKenzie, Dunn, Billings
Siting Application
- Letter of Intent, Waiting Period, Application Fee, January 27, 2010
Case No. PU-09-724
NextEra Energy Resources, LLC
230 kV AC Transmission Line - Oliver & Morton Ctys
Siting Application
- Letter of Intent, Filing Fee and Waiting Period, December 10, 2009
Case No. PU-09-692
Basin Electric Power Coop/PrairieWinds ND 1 Inc.
Transfer of Site Certificate
Siting Application
- Notice of Opportunity for Hearing, November 12, 2009
Case No. PU-09-674
Otter Tail Power Company
230 kV Electric Transmission Line - Sargent Cty
Siting Application
- Letter of Intent, December 10, 2009
- Notice of Opportunity for Hearing, January 27, 2010
Case No. PU-09-670
Minnkota Power Coop., Inc.
345 kV Transmission Line - Center to Grand Forks
Siting Application
- Letter of Intent, Filing Fee and Waiting Period, October 28, 2009
Case No. PU-09-668
NextEra Energy Resources, LLC
99 mW Baldwin Wind Energy Center - Burleigh Cty
Siting Application
- Letter of Intent, October 14, 2009
Case No. PU-09-663
Hawthorn Oil Transportation (North Dakota), Inc.
4.5 - Inch Condensate Pipeline/Mountrail Cty
Siting Application
- Letter of Intent, One Year Waiting Period, Application Fee, October 14, 2009
Case No. PU-09-631
Allete, Inc./Square Butte Electric Cooperative
Transfer of Corridor Certificates & Route Permits
Siting Application
- Notice of Opportunity for Hearing issued, September 9, 2009
- Order & Reissued Certificates/Permits, October 28, 2009
Case No. PU-09-587
Allete, Inc.
230 kV Transmission Line - Morton/Oliver Counties
Siting Appliction
- Notice of Filing and Notice of Hearing, December 31, 2009
Case No. PU-09-221
M-Power, LLC/ Ashtabula Wind II, LLC
Transfer of Site Certificate
Siting Application
- Notice of Opportunity for Hearing issued June 3, 2009
Case No. PU-09-153
Hawthorne Oil Transportation (North Dakota) Inc.
12-inch Crude Oil Pipeline - Mountrail County
Siting Application
- April 29, 2009 - Letter of intent, One year waiting peiod waived and filing fee.
- October 14, 2009 - Notice of Filing and Notice of Hearing
Case No. PU-09-151
Allete, Inc.
Bison 1 Wind Project - Oliver/Morton Countines
Siting Application
- April 13, 2009 - Letter of Intent
- July 8, 2009 - Notice of Filing and Notice of Hearing
Case No. P-09-84
Rough Rider Wind, LLC
150 MW Wind Farm - Dickey County
Siting Application
- March 11, 2009 Notice of Filing and Notice of Hearing
Case No. P-09-53
Ashtabula Wind, LLC/ Otter Tail Corp.
Partial Transfer of Site Certificate
Siting Application
- Notice of Opportunity for Hearing February 25, 2009
Case No. 08-923
Saddle Butte Pipeline LLC
Natural Gas/Crude Oil System - McKenzie and Dunn counties
- Notice of Opportunity for Hearing (140 kb pdf) issued December 31, 2008.
- January 28, 2009 Notice Extending Opportunity for Hearing.
Case No. 08-932
Enxco Service Corp.
Merricourt Wind Power Project
- Letter of Intent acknowledged, waiting period waived, application fee accepted December 31, 2008.
Case No. 08-931
Just Wind, LLC
Emmons County Wind Farm Project
- Letter of Intent acknowledged, waiting period waived, application fee accepted December 31, 2008.
Case No. 08-871
Pecan Pipeline (North Dakota), Inc.
12-inch Natural Gas Pipeline - Mountrail County
Siting Application
- Letter of Intent acknowledged, waiting period waived, application fee accepted November 20, 2008.
Case No. PU-08-844
Whiting Oil and Gas Corp.
8-inch natural gas line - Mountrail County
- Letter of intent acknowledged, waiting period waived November 5, 2008.
- November 26, 2008, Notice of Filings and Hearings (281 kb pdf).
- January 28, 2009 Notice of filings and notice of rescheduled hearings.
Case No. PU-08-843
Whiting Oil and Gas Corp.
6-inch natural gas line - Mountrail County
- Letter of intent acknowledged, waiting period waived November 5, 2008.
- November 26, 2008, Notice of Filings and Hearings (281 kb pdf).
- January 28, 2009 Notice of filings and notice of rescheduled hearings.
Case No. PU-08-847
Allete, Inc.
125 MW Wind Farm - Oliver County
- Letter of Intent acknowledged, waiting period waived, application fee accepted November 5, 2008.
Case No. PU-08-847
Allete, Inc.
230 kv Transmission Line - Oliver County
- Letter of Intent acknowledged, waiting period waived, application fee accepted November 5, 2008.
Case No. PU-08-812
Enbridge Pipelines (North Dakota) LLC
Stanley Pump Station Upgrades
- Letter of Intent acknowledged October 22, 2008.
- Notice of filing and opportunity for hearing October 22, 2008.
Case No. PU-08-797
Sequoia Energy
150 MW Wind Farm Rolette/Towner
- Letter of Intent acknowleded October 22, 2008.
Case No. PU-08-766
Otter Tail Corp. 49.5 MW Luverne Wind Farm
- Public Convenience and Necessity. October 8, 2008 Notice of Opportunity for Hearing (165 kb pdf)
Case No. PU-08-784
Public Service Commission vs. Tatanka Wind Power, LLC
Complaint
- Sept. 24 Prima Facie Finding and Service of Complaint (165 kb pdf).
Case No. PU-08-597
Hartland Wind Farm, LLC
2,000 MW Wind Farm - Ward/Burke/Mountrail counties
- Letter of intent acknowledged October 22, 2008.
Case No. PU-08-424
Plains All American Pipeline, LP
6-inch Crude Oil Pipeline - Dunn and Stark counties
Siting Application
- Letter of Intent filed June 30, 2008.
- Letter acknowledged July 16, 2008.
Case No. PU-08-400
FPL Energy, LLC
1,000 MW Wind Farm - Oliver County
- Letter of Intent filed June 26, 2008.
- Letter acknowledged July 2, 2008.
Case No. PU-08-375
FPL Energy, LLC
Wind Energy - Ellendale
- Letter of Intent filed June 23, 2008
- Letter acknowledged, filing fee assessed and waiting period shortened July 2, 2008.
Case No. PU-08-241
FPL Energy Oliver Wind LLC and FPL Energy OLiver
Transfer of Corridor Certificate and Route Permit
Application
- August 13, 2008 Notice of Opportunity for Hearing (190 kb pdf).
Case No. PU-08-159
Langdon Wind, LLC
Partial Transfer of Site Certificate
- April 23, 2008: Notice of Opportunity for Hearing (268 kb pdf).
Case No. PU-08-107
M-Power, LLC
230v Electric Transmission Line - Steele County
- Letter of Intent filed March 4, 2008
- Letter of intent acknowledged, waiting period waived, and filing fee assessed March 26, 2008
- Notice of filing and Notice of Hearings (473 kb pdf), June 19, 2008.
- Listen to July 28, 2008 hearing (65 MB mp3)
Case No. PU-08-75
Prairie Winds ND 1, LLC
Electric Generation/Wind - Ward County
Application
- Letter of Intent filed February 21, 2008.
- Letter of intent acknowledged, waiting period waived, and filing fee assessed March 12, 2008.
Case No. 08-73
Ashtabula Wind, LLC
230 kV Electric Transmission Line - Barnes County
Siting Application
- Application filed March 24, 2008.
- Hearing notice issued April 4, 2008.
- Hearing held May 2, 2008 in Valley City. Audio (130 MB mp3).
Case No. PU-08-48
Otter Tail Corp./Minnkota Power Cooperative
Luverne to Maple River Transmission Line
Application
- Letter of Intent filed February 5, 2008.
- Letter of intent acknowledged, waiting period waived, and filing fee assessed February 13, 2008.
- July 8, 2008 Meeting Audio: Part One (117 MB mp3; Part Two (9.5 MB mp3).
Case No. PU-08-46
Crownbutte Wind Power, LLC
Electric Generation/Wind - Adams and Bowman counties
Siting Application
- Letter of Intent filed February 4, 2008.
- Letter of intent acknowledged, waiting period waived, and filing fee assessed February 13, 2008.
Case No. PU-08-34
M-Power LLC
Siting Application - Wind Farm
- Application filed May 16, 2008.
- Listen to July 28, 2008 hearing (28 MB mp3)
- Listen to August 25, 2008 hearing (41 MB mp3)
Case No. PU-08-32
FPL Energy, LLC
Electric Generation/Wind - Barnes County
Siting Application
- Letter of Intent filed Jan. 14, 2008.
- Letter of intent acknowledged, waiting period waived, and filing fee assessed Jan. 30, 2008.
- Hearing notice issued April 4, 2008.
- Hearing held May 2, 2008 in Valley City. Audio (183 MB mp3).
Case No. PU-07-791
Enbridge Pipelines (North Dakota) LLC
Pump Station Upgrades
- Letter of Intent Filed Dec. 19, 2007.
- Letter of Intent acknowledged Jan. 16, 2008.
- Notice of Filing and Opportunity for Hearing: March 26, 2008.
- Notice of Hearing: May 21, 2008 (197 kb pdf).
- Notice of Cancellation of Formal Hearing and Notice of Informal Hearing: June 19, 2008.
Case No. PU-07-766
Otter Tail Corp.
230 kv transmission line rerout Richland County
- Letter of Intent filed Nov. 28, 2007.
Case No. PU-07-759
Northern States Power Co.
Fargo-Monticello, MN 345 kv CapX transmission line
Siting application
- Letter of Intent filed Nov. 14, 2007.
Case No. PU-07-722
Langdon Wind, LLC
Expansion of existing Langdon wind farm of up to 40MW
Siting Application
- Letter of intent filed Oct. 15, 2007
- Letter of intent acknowledged October 24, 2007
- Notice of Filing and Notice of Hearing (294 kb pdf) February 13, 2008
- Findings of Fact, Conclusions of Law and Order issued May 7, 2008.
Case No. PU-07-671
230kV Transmission Line/Williams County to Williams County
Siting Application
- Letter of intent filed September 13, 2007
- Letter of intent acknowledged September 19, 2007
Case No. PU-07-600
Crude Oil Pipeline Reroute - Williams County
Siting Application
- Letter of intent filed August 9, 2007
- Letter of intent acknowledged, waiting period waived, and filing fee assessed August 22, 2007
- Notice of opportunity for hearing issued August 22, 2007
- Corridor certificate and route permit issued September 19, 2007
Case No. PU-07-596
Bell Fourche Pipeline Company
8-Inch Crude Oil Pipeline/McKenzie County
Siting Application
- Letter of intent filed August 2, 2007
- Letter of intent acknowledged, waiting period shortened, and filing fee assessed August 8, 2007
- Notice of filing and notice of hearing issued, September 25, 2007
- Public hearing scheduled for Tuesday, October 30, 2007 at 10 a.m. CDT (9 a.m. MDT) at the McKenzie County Courthouse, 201 5th Street NW, Watford City, ND
Case No. PU-07-516
Westmoreland Power, Inc.
Gascoyne Generating Station
Siting Application
- Letter of intent filed July 20, 2007
- Letter of intent acknowledged and filing fee assessed August 8, 2007
Case No. PU-07-184
Dakota Gasification Company
CO2 Pipeline
Siting Application
- Letter of intent filed May 7, 2007
- Letter of intent acknowledged, waiting period shortened, and filing fee assessed May 11, 2007
- Application filed May 11, 2007
- Notice of hearing issued May 16, 2007
Case No. PU-07-169
Basin Electric Power Coop Inc.
230 kV Transmission Line/Stark to Bowman Ctys
Siting Application
- Letter of intent filed April 26, 2007.
- Notice of Filing and Hearing (15 kb pdf), June 19, 2008.
- November 3, 2008 work session (49 MB mp3).
Case No. PU-07-108
Enbridge Energy, Limited Partnership
36-Inch LP Pipeline/Pembina County
Siting Application
- Letter of intent filed March 16, 2007
- Letter of intent acknowledged, waiting period shortened and filing fee assess March 21, 2007
- Notice of filing and notice of hearing issued August 22, 2007
Case No. PU-07-75
Enbridge Pipelines (Southern Lights) L.L.C.
Pembina County LP Pipeline
Siting Application
- Letter of intent filed February 22, 2007
- Letter of intent acknowledged, waiting period shortened, and filing fee assessed March 7, 2007
- Notice of filing and notice of hearing issued August 22, 2007
Case No. PU-07-54
Just Wind – Wind Farm Development
Wind Farm – Logan County
Siting Application
- Letter of intent filed February 8, 2007
- Letter of intent acknowledged, waiting period shortened, and filing fee assessed February 23, 2007
- Notice of Filing and Notice of Hearing Sept. 10, 2008 (476 kb pdf)
- Audio of October 21, 2008 hearing in Napoleon
- Notice of Request to Amend Certificate and Notice of Hearing. December 10, 2009
- Withdrawal of Request to Amend Commission Order and Cancellation of Hearing, January 13, 2010
Case No. PU-07-26
FPL Energy, LLC
Wind Farm - Cavalier County
Siting Application
- Letter of intent filed January 22, 2007
- Letter of Intent acknowledged, waiting period shortened, and filing fee assessed February 7, 2007
- Notice of filing and notice of hearing issued April 4, 2007
- Certificate of site compatibility issued May 31, 2007
Case No. PU-06-443
Tatanka Wind Power LLC
230 kV Transmission Line/Dickey & McIntosh Counties
Siting Application
- Letter of intent filed October 13, 2006
- Application filed November 2, 2006
- Notice of filing and notice of hearing issued on November 22, 2006
- Findings of fact, conclusions of law and order issued on March 21, 2007
Case No. PU-06-421
TransCanada Keystone Pipeline, LLC
30-Inch Crude Oil Pipeline - Pembina to Sargent Counties
Siting Application
- Letter of intent acknowledged October 25, 2006 and filing fee assessed
- Letter of Intent-to-Application 1-year waiting period shortened December 29, 2006
- US Department of State Invitation to Inter-agency & Inter-government Meeting, February 22, 2007 (296 kb pdf)
- Corridor width established May 2, 2007
- Notice of filing and notice of hearing issued May 2, 2007
- Public hearings to be held Monday, July 23, 2007 at 1 p.m. CDT at the Barnes County Courthouse, 230 4th St NW, Valley City, ND 58072 and Tuesday, July 24, 2007 at 1 p.m. CDT at the City Office Building, 514 Briggs Ave S, Park River, ND 58270
- Notice of Continued Hearing issued August 8, 2007. Hearing to be held Wednesday, September 5, 2007 at 9:00 a.m. CDT in the Commission Hearing Room, State Capitol, 12th Floor, Bismarck, North Dakota 58505.
- Listen to the hearing held on September 5, 2007 (473.92 MB MP3)
- Listen to the hearing continued and concluded on September 6, 2007 (465.04 MB MP3)
- Listen to October 29, 2007 work session (52 MB mp3).
- Listen to October 31, 2007 work session (24 MB mp3).
- Listen to November 5, 2007 work session (73 MB mp3).
- Listen to November 9, 2007 work session (25 MB mp3).
- Order on request to intervene and reopen the record issued November 7, 2007.
- Notice of intent to consider information not presented at a hearing issued November 7, 2007.
- Notice of further hearing on expidited timeframe issued Nov. 8, 2007. Hearing to be held Nov. 27 and 28 at 8 a.m. CDT in the Commission Hearing Room, State Capitol, 12th Floor, Bismarck, North Dakota 58505.
- Listen to November 9, 2007 work session (25 MB mp3).
- Listen to the hearings on Nov. 27, 2007 and Nov. 28, 2007. Part One (259 MB mp3). Part 2 (214 MB mp3); Part 3 (258 MB mp3).
- Listen to January 18, 2008 work session (54 MB mp3).
- Listen to January 25, 2008 work session (64 MB mp3).
- Notice of intent to consider information not presented at a hearing issued January 30, 2008.
- Listen to February 4, 2008 work session (60 MB mp3).
- Listen to February 8, 2008 work session (84 MB mp3).
- Listen to February 21, 2008 work session (57 MB mp3).
- February 21, 2008: Findings of Fact, Conclusions of Law and Order (2 MB pdf).
- April 16, 2008, Request for Proposal (3.8 MB pdf).
- April 16, 2008, Notice of Informal Hearing and Opportunity for Hearing (193 kb pdf).
- June 19, 2008, Third Supplemental Order (321 kb pdf).
- July 2, 2008, Fourth Supplemental Order (353 kb pdf).
- July 30, 2008 withdrawl of motion for approval of pending route refinement.
- August 27, 2008, Fifth Supplemental Order (371 kb pdf).
Case No. PU-06-349
Enbridge Pipelines (North Dakota) LLC
Crude Oil Pump. Stations-Mountrail-McHenry-Ramsey-Grand Forks Countys
Siting Application
- Notice of Filing and Notice of Opportunity for Hearing issued August 9, 2006
- Order for siting approval and certificates issued September 20, 2006
- Order on Request for Variance issued on October 12, 2006
Case No. PU-06-330
Enbridge Pipelines (North Dakota ) LLC
Trenton to Beaver Lodge Pipeline - Williams County
Siting Application
- Letter of intent filed July 26, 2006
- Notice of filing and notice of hearing issued on July 28, 2006
- Order for siting approval and certificates issued September 20, 2006
- Order on Request for Variance issued on October 12, 2006
- Pipeline route supplemental order issued April 4, 2007
- Route deviation and tree and shrub specification approved August 22, 2007
Case No. PU-06-317
Enbridge Pipelines (North Dakota) LLC
Crude Oil Pump. Stations-McKenzie-Williams-Mountrail Countys
Siting Application
- Letter of intent filed on July 20, 2006
- Notice of Filing and Notice of Opportunity for Hearing issued July 26, 2006
- Order for siting approval and certificates issued August 23, 2006
- Order on Request for Variance issued October 12, 2006
Case No. PU-06-312
FPL Energy Oliver County Wind, LLC
230kV Transmission Line - Oliver County
Siting Application
- Letter of intent to file an application for waiver of procedures and time schedule filed July 17, 2006
- Letter of intent acknowledged, waiting period for filing application shortened, and filing fee assessed on July 26, 2006
- Order for siting approval and certificates issued on August 23, 2006
Case No. PU-05-602: Proposed Administrative Rules Case No. PU-05-602 Notice of Intent to Adopt and Amend Administrative Rules and Notice of Public Hearing (21 kb pdf)
Case No. PU-05-418
Plains Pipeline, L.P.
Trenton Pipeline System--McKenzie-Williams Counties
Public Convenience & Necessity
- Notice of Opportunity for Hearing filed July 13, 2005 (comment period ends August 16, 2005)
- Order and certificate issued November 17, 2005
Case No. PU-05-305
PPM Energy, Inc.
230 kV Transmission Line
Siting Application
- Letter of intent filed January 28, 2005
- Supplement to letter of intent filed February 10, 2005
- Letter of intent acknowledged and waiting period shortened March 9, 2005
- Filing fee assessed May 24, 2005
- Application filed June 16, 2005
- Notice of filing and notice of hearing issued June 29, 2005
- Hearing July 29, 2005 at 9 a.m. in Rugby at the Pierce County Courthouse, 240 2nd Street SE, Rugby, ND
- Findings of fact, conclusions of law and order issued September 7, 2005
- September 10, 2008 motion to approve site plan changes.
Case No. PU-05-274
Enbridge Pipelines (North Dakota LLC)
Crude Oil Pumping Stations-McKenzie-Williams County
Siting Application
- Application filed May 3, 2005
- Letter of intent acknowledged May 24, 2005
- Notice of Filing and Notice of Opportunity for Hearing issued May 24, 2005 (comment period ends June 24, 2005)
- Filing fee assessed June 7, 2005
Case No. PU-05-205
FPL Energy Burleigh County Wind, LLC
230 kV Transmission Line – Burleigh County
Siting Application
- Application filed April 21, 2005
- Notice of hearing issued April 25, 2005
- Public Hearing May 23, 2005 at 9 a.m. CDT Center Civic Center and 3 p.m. Wilton Memorial Hall
- Hearing continued
- Amended application filed June 24, 2005
- Notice of hearing on amended application – July 28, 2005 at 1:30 p.m. CDT in the Commission Hearing Room, 12th Floor, State Capitol, Bismarck, ND
- Letter of intent filed April 5, 2005
- Letter of intent acknowledged and waiting period shortened April 6, 2005
- Filing fee assessed May 24, 2005
- Corridor and route findings of fact, conclusions of law, and order passed August 10, 2005
Case No. PU-05-185
Plains Pipeline, L.P.
Buford Expansion/McKenzie Williams Counties
Siting Application
- Letter of intent filed March 28, 2005
- Letter of intent acknowledged April 6, 2005
- Filing fee assessed May 24, 2005
- Consolidated application filed July 26, 2005
- Notice of filing and notice of hearing issued October 5, 2005
- Hearing November 3, 2005 at 1:00 CST at Williston City Hall, City Commisison Meeting Room, 22 East Broadway, Williston, ND
Case No. PU-05-184
Plains Pipeline, L.P.
Trenton Station Expansion/Williams County
Siting Application
- Letter of intent filed March 28, 2005
- Letter of intent acknowledged on April 6, 2005
- Filing fee assessed May 24, 2005
- Consolidated application filed June 20, 2005
- Notice of filing and notice of hearing issued July 14, 2005
- Hearing August 11, 2005 1:00 p.m. CST at the Williston City Call, City Commision Meeting Room, 22 East Broadway, Williston, ND
- Supplemental information filed September 13, 2005
- Findings of fact, conclusions of law and order issued October 5, 2005
Case No. PU-05-47
PPM Energy, Inc.
Rugby Wind Farm – Pierce County
Siting Application
- Letter of intent filed January 28, 2005
- Supplement to letter of intent filed February 10, 2005
- Letter of intent acknowledged and waiting period shortened March 9, 2005
- Filing fee assessed May 24, 2005
- Application filed June 16, 2005
- Notice of filing and notice of hearing issued June 29, 2005
- Hearing July 29, 2005 at 9 a.m. in Rugby at the Pierce County Courthouse, 240 2nd Street SE, Rugby, ND
- Hearing on PPM’s proposed and alternative wind turbine locations will be held September 26, 2005 at 10 a.m. CDT at the Pierce County Courthouse, 240 2nd Street SE, Rugby, ND
- Notice of hearing acknowledged September 7, 2005
- Findings of Fact, Conclusions of Law and Order issued October 3, 2005 Note: Order redacted for security reasons. (58 kb pdf)
- September 10, 2008 motion to approve site plan changes.
- January 14, 2009 notice of turbine location changes.